Dipper Payload : 109.0 t
Dipper Capacity : 30.6-62.7 m3 (40-82 yd3)
Dipper Payload (Available Dipper Payloads Up To 109 Tonnes [120 tons] When Specified) : 109.0 t
Name : Cat
Service Tel : (309)578-6298
E-mail :
Web Site : https://www.caterpillar.com/en.html
Address :
Electric rope shovels have been successfully removing overburden and ore on mine sites around the world for more than a century. Driven by a vision to make these highly productive machines safer, more reliable and even more productive, we challenged the status quo and built an electric rope shovel that's better.
Dipper Payload | 120.0 t 109.0 t | More |
Dipper Capacity | 30.6-62.7 m3 (40-82 yd3) 30.6-62.7 m3 (40-82 yd3) | More |
Dipper Payload (Available Dipper Payloads Up To 109 Tonnes [120 tons] When Specified) | 120.0 t 109.0 t | More |
Note | Dependent on application and material density Dependent on application and material density | More |
Ballast - Furnished By Customer | 667150.0 lb 302614.0 kg | More |
Note (1) | These weights will vary slightly depending upon dipper and optional equipment selection These weights will vary slightly depending upon dipper and optional equipment selection | More |
Note (2) | All specifications are based on a 45 m3 (59 yd3) dipper and standard 317.5 cm (125 in) treads All specifications are based on a 45 m3 (59 yd3) dipper and standard 317.5 cm (125 in) treads | More |
Working Weight - With Dipper and Standard Links | 3164000.0 lb 1435156.0 kg | More |
Crawler Dimensions - Overall Width 317.5 cm (125 in) Treads | 41.67 in 12.7 cm | More |
Ground Bearing Pressure - Note | Ground bearing pressure is dependent upon many factors Ground bearing pressure is dependent upon many factors | More |
Ground Bearing Pressure - Total Effective Bearing Area (317.5 cm/125 in) Treads | 57 m2 (248 kPa); 614 ft2 (36 psi) 57 m2 (248 kPa); 614 ft2 (36 psi) | More |
Hoist | A planetary gearbox with dual-output pinions provides the hoist torque transfer from the electric motor to the hoist drum gear. A planetary gearbox with dual-output pinions provides the hoist torque transfer from the electric motor to the hoist drum gear. | More |
Planetary Propel | Dual-motor independent drive Dual-motor independent drive | More |
Swing | Two planetary gearboxes, each driven by a vertically mounted motor, are located on either side of the revolving frame. Dual-output pinion shafts from each gearbox engage the swing rack. Two planetary gearboxes, each driven by a vertically mounted motor, are located on either side of the revolving frame. Dual-output pinion shafts from each gearbox engage the swing rack. | More |
Upper Works Overall Width - Including Standard Walkways | 41.99 in 12.8 cm | More |
Components (1) | Six pumps (four for open gear lubricant and two for grease) located in an insulated, heated, double-walled lube room Six pumps (four for open gear lubricant and two for grease) located in an insulated, heated, double-walled lube room | More |
Type | Automatic, single-line system for open gear lubricant and grease Automatic, single-line system for open gear lubricant and grease | More |
Components (2) | External fast fill from lower level External fast fill from lower level | More |
Drive | IGBT Acutrol drive system IGBT Acutrol drive system | More |
Note | Other voltage options available to suit customer requirements Other voltage options available to suit customer requirements | More |
Power Requirements - 50 Hz | 6,000V, 6,600V, 7,200V, 11,000V 6,000V, 6,600V, 7,200V, 11,000V | More |
Power Requirements - 60 Hz | 7,200V, 13,800V 7,200V, 13,800V | More |
Power Requirements - Average Power Demand | 945-1322 kW 945-1322 kW | More |
Power Requirements - Peak power | 3778 kW 3778 kW | More |
Power Requirements - Voltage | 3 phase, 50/60 Hz, 7,200V 3 phase, 50/60 Hz, 7,200V | More |
System Voltage - Nominal | 50/60 Hz, 7,200V 50/60 Hz, 7,200V | More |
Components | One piece, forged, seamless tubular dipper handle and wide-spread boom point sheaves equipped with hoist ropes and dipper padlocks to stabilize dipper handle. One piece, forged, seamless tubular dipper handle and wide-spread boom point sheaves equipped with hoist ropes and dipper padlocks to stabilize dipper handle. | More |
Crowd (1) | HydraCrowd, hydraulic power skid, located at the front center of the revolving frame deck, powers a large hydraulic cylinder to move the dipper handle fore and aft. HydraCrowd, hydraulic power skid, located at the front center of the revolving frame deck, powers a large hydraulic cylinder to move the dipper handle fore and aft. | More |
Crowd (2) | (Optional) Rope Crowd, the crowd machinery is located at the front center of the revolving frame, consisting of motor, brake, drum and gearing. Plastic-impregnated crowd and retract ropes are used to move the dipper handle fore and aft. (Optional) Rope Crowd, the crowd machinery is located at the front center of the revolving frame, consisting of motor, brake, drum and gearing. Plastic-impregnated crowd and retract ropes are used to move the dipper handle fore and aft. | More |
Rope Data - Boom Suspension - Diameter | 3.25 in 83.0 mm | More |
Rope Data - Boom Suspension - No. | 4 4 | More |
Rope Data - Dipper Trip - Diameter | 0.75 in 19.0 mm | More |
Rope Data - Dipper Trip - No. | 1 1 | More |
Rope Data - Hoist - Diameter | 2.75 in 70.0 mm | More |
Rope Data - Hoist - No. | 2 2 | More |
Rope Data - Note | High impact ropes available as an option High impact ropes available as an option | More |
Cutting Height - Maximum | 55.0 ft 16.8 m | More |
Cutting Radius - Maximum | 79.72 ft 24.3 m | More |
Dumping Height - With Clearance to Open Dipper Door | 29.53 ft 9.0 m | More |
Note (1) | Optimal working ranges based on loading a Cat 797F truck. Optimal working ranges based on loading a Cat 797F truck. | More |
Note (2) | *All specifications are based on a 45 m3 (59 yd3) dipper and standard 317.5 cm (125 in) treads. *All specifications are based on a 45 m3 (59 yd3) dipper and standard 317.5 cm (125 in) treads. | More |
Radius of Level Floor | 55.77 ft 17.0 m | More |
Revolving Frame Tail Swing Radius | 30.51 ft 9.3 m | More |